Hand Tools (PW1) |
AL018 |
Identification and use of hand, measuring and marking off tools. |
15 Days |
Power Tools (PW 2) |
AL019 |
Identification and use of power tools. |
15 Days |
Basic Welding (SW1) |
AP004 |
Introduction to oxy-fuel manual cutting. Basic manual metal arc welding process. Oxy- acetylene gas welding and brazing. |
15 Days |
Semi-Advanced Techniques in Welding,Brazing & Cutting (SW2) |
AP007 |
Semi advanced positional shielded metal arc welding, Profile cutting processes using Oxy- acetylene and plasma, Air-arc and Oxy-fuel gouging, Advanced training in Oxy-acetylene positional Welding, Brazing of Non-Ferrous and Ferrous metals. |
30 Days |
Advanced Shielded Metal Arc Welding (SW3) |
AP010 |
Advanced full positional Sheilded metal arc welding(smaw) with E6103 and E7108 electrodes, Positional pipe welding(1G, 2G and 6G). |
30 Days |
Basic Rigging (BTW) |
AQ024 |
Recall and demonstrate overhead crane signals. Use of lifting equipment as prescribed. |
5 Days |
Boilermaking Machinery (KW2) |
AN008 |
Introduction to and use of Boilermaking Trade related machinery to manufacture various projects. |
15 Days |
Oxy-Fuel Cutting (KW3) |
AN012 |
Care, Use and storage of oxy-fuel manual and semi automatic flame cutting equipment. Oxy-fuel cutting of various thicknesses of plate, sections and pipe. |
15 Days |
Development & Manufacture (KW4) |
AN016 |
Use of development methods to manufacture equal diameter connections, transformers and cones using trade related machinery. |
15 Days |
Structural Steel (KW5) |
AN018 |
Orthographic projections, introduction to steel profile tables and calculations based on structural steelwork.Design and construct various steel structures and connections according to engineering principles. |
15 Days |
Drawing & Development (KW6) |
AN016 |
Advanced development of pipes, cones and various transition pieces using the three development methods in order to produce templates. |
15 Days |
Advanced Fabrication (KW7) |
AN034 |
Fabrication of pipe connections, cones, lobster back bends (using pre-fabricated pipes), square to round transformer and manufacture and installation of flanges. |
15 Days |
|
|
Total duration of Institutional Training: |
40 weeks |
Trade Finishing : |
AN027 |
Development and manufacture of various off-set transition pieces, off-set unequal square and round pipe intersections, pipe to cone intersections and construction marking-off in preparation for Merseta Trade Test. |
6 weeks |