Course | Code | Description | Duration |
Basic Hand Skills (PW 1) |
AL018 |
Identification and use of hand tools. |
15 Days R6750 |
Basic Rigging
(BTW) |
AQ024 | Recall and demonstrate overhead crane signals. Use of lifting equipment as prescribed. | 5 Days
R2250 |
Bricklaying | BR001 | Introduction to building industry.
Verify compliance to safety, health and environ- mental requirements in the workplace. Read and interpret drawing and symbols. Lay half brick wall in stretcher bond between the profiles. Lay one brick wall between the profiles/column. (stretcher bond) Build one brick wall in English bond. Plaster wall and screed floor and steps. Build a half brick wall corner and one brick wall Corner in stretcher bond by using the y-axis and x-axis grid lines. Erect and dismantle scaffolding. Build decorative brick-on-edge, brick-on-end (soldier course). |
20 Days
R9000 |
Bricklaying 2 |
BR002 |
Set out, excavate, cast concrete strip foundation and build foundation walling. Build a right angle one brick wall with half brick wall T-junction and stop end. Build in a bath. Build a man hole with corbelling. Build and isolated pier. Prepare and lay pavers / paving bricks. Build a one brick wall with an end and attached pier. |
20 Days R9000 |
Bricklaying 3 | BR003 | Build a flat arch using a face brick.
Build a segmental arch using face brick. Build a semi-circular arch using face brick. Plaster inside walls of the arches. Build brick steps. Tile a plastered wall. Build a concrete masonry block wall, with right angle return, between profiles. (90mm blocks). Build a block wall with a wooden doorframe and steel window frame. Build a cavity wall with steel door frame and steel window frame. Build a cavity concrete masonry block wall with a timber doorframe and precast lintel and a tile sill. |
30 Days
R13500 |